View of the local elevator’s pit from the semi cab. It’s a tight fit! The semi will drive forward until its first hopper is over the grates in the floor and then will unload the grain. With this pit only one hopper of the semi can be unloaded at one time so the semi driver has to move forward to unload the second hopper.